Capabilities
Manufacturing capabilities
Each stage of the SMT and inspection line, what it does, what it accepts, and what it produces.
SMT PCB Production Line
The in-house SMT PCB production line: paste printing, pick-and-place, soldering and reflow, inspection.
DDM Novastar SPR-45, DDM Novastar LS60, DDM Novastar GF-120HT
More InfoSolder Paste Printing
Stencil-based paste deposit on the SPR-45 with dual-squeegee control.
DDM Novastar SPR-45
More InfoPick-and-Place Assembly
Component placement on the LS60: 0201 to BGA, up to 4800 cph.
DDM Novastar LS60
More InfoSoldering and Reflow
Six-zone horizontal convection reflow on the GF-120HT, lead-free SAC305 capable.
DDM Novastar GF-120HT
More InfoInspection In-House, Functional Test Sourced
AOI on every board in-house. Functional test and X-ray sourced through partners when the test plan requires it.
More InfoFirmware Loading and Serialization
In-line and offline programming with multi-image support, signed bootloaders, and per-unit serial assignment.
More InfoBox-Build and Packaging
Sub-assembly through finished packed unit: cabling, mechanical, sealing, antenna, label, packaging.
More InfoTalk to engineering about your boards
Send a BOM and gerbers and we will scope what fits the line and where DFM gaps exist.