Capability
Firmware Loading and Serialization
Firmware loading and serialization are where a board becomes a unique, addressable, trusted device. Loaded on the line through dedicated fixtures, with per-unit identity logged into the traceability database. When a customer test plan calls for functional test alongside, we coordinate that through partner test houses.
Process detail
- STAGE INPUT
-
Programming setup
Fixture wired, debug interface (SWD, JTAG, UART, USB-DFU) confirmed.
-
Multi-image load
Bootloader, application, file system, and manufacturing partition written in sequence.
-
Provisioning
Secure element key injection, X.509 enrollment, eFuse or OTP burn.
-
Serial assignment
MAC, UID, or unique serial assigned and written to device.
-
Label application
GS1 DataMatrix or QR label with serial, batch, manufacturing date.
-
Traceability log
Per-unit firmware hash, serial, provisioning timestamp committed to database.
- STAGE OUTPUT
Files we accept
- Firmware binary (hex, bin, signed image)
- Provisioning template
- Label artwork
- PKI root certificate (if custom)
Tolerances and specs
- Interfaces
- SWD, JTAG, UART, USB-DFU
- Identity options
- MAC (IEEE OUI), UID, EUI-64, custom serial
- Label encoding
- GS1 DataMatrix, QR (ISO/IEC 15415)
Frequently asked questions
Can you load and provision firmware in production?
Yes. Firmware loading runs on the line through dedicated programming fixtures. We support SWD, JTAG, UART, and USB-DFU interfaces, multi-image programming (bootloader, application, file system), and signed bootloader chains. When the customer test plan calls for functional test alongside flashing, the unit moves on to a partner test house with the firmware already loaded.
How do you handle embedded software and secure provisioning?
We support X.509 certificate enrollment, secure-element key injection (ATECC608, NXP EdgeLock), eFuse and OTP programming, and provisioning to AWS IoT Core, Azure DPS, and custom PKI. Private keys can be HSM-generated and never exposed to host systems.
How do you serialize and label units?
Per-unit MAC, UID, and serial number assignment with GS1 DataMatrix or QR labels. Polyimide or polyester label stock based on environmental requirements. Every label is logged against board lot, firmware hash, and test result for full traceability.
Discuss this capability
Share your BOM, gerbers, and CPL. Engineering reviews fit, throughput, and DFM, and replies within one business day.