Portfolio
Products assembled in our facility
A reference of devices built on the Energetika-VDS in-house SMT line: billing meters, temperature regulators, LED fixtures, RGB architectural lighting, and GSM street-light control. Each product is a real PCBA and box-build job we have run.
Compare our meters
Pick by phase, tariff depth, current rating, connection, and communication. Rows link to the full product page.
| Meter | Phase | Tariffs | Current | Connection | Communication | Constant |
|---|---|---|---|---|---|---|
| M96 C6NKP | Single | 4 | 10(60) A | Direct | Optical IEC 62053-21 | 800 imp/kWh |
| M96 SMART | Single | 4 + 8 memory | 10(60) A | Direct | Optical + GSM (opt) | 800 imp/kWh |
| T96 C1NKP | Three | 4 | 5(6) A | CT | Optical IEC 62053-21 | 8000 imp/kWh |
| T96M-C6NKP DLC | Three | 4 | 10(60) A | Direct | Optical + DLC modem | 400 imp/kWh |
| T96SD4N Prepaid | Three | 2 | 10(60) A + 100 A breaker | Direct | Smart card | 400 imp/kWh |
| T96 STC6NKP | Three | 4 + 8 memory | 10(60) A / 5(6) A | Direct / CT | Optical IEC 62056-21 + GSM (opt) | 1200 imp/kWh |
| Four Phase | Four | per spec | per spec | per spec | per spec | per spec |
Energy & Metering
Electronic single-phase and three-phase watt-hour meters, multi-tariff billing platforms, smart-card prepayment, DLC power-line carrier, and field power analysers. All built on our SMT line in Strumica.
T96 C1NKP Three Phase Electronic Watt-Hour Meter
Class 2 three-phase CT-connected electronic meter with optical IEC 62053-21 port, four-tariff register, 12 Mb load profile, and per-phase voltage / current readout.
View detailsT96M-C6NKP Three Phase Electronic Meter with DLC Modem
Three-phase electronic meter with integrated DLC (distribution-line-carrier) modem, per-phase remote disconnect, programmable overcurrent threshold, and optical IEC port.
View detailsM96 C6NKP Single Phase Electronic Watt-Hour Meter
Class 2 single-phase electronic meter with four-tariff register, optical IEC 62053-21 port, 12 Mb load profile, and 60 A direct connection.
View detailsT96SD4N Prepaid Three Phase Two Tariff Meter
Mechatronic prepaid three-phase meter with integrated 100 A three-pole breaker, smart-card top-up, dual LCD, and two-tariff billing.
View details
Analyzer K-10 Three Phase Field Power Analyzer
Portable three-phase power analyser with current clamps (1000/5/1 A scaling), 24-hour autonomous logging, and VDS32 Visionary Design System PC software.
View detailsK-96 Digital Real Time Counter
Single-phase digital real-time operating-hour counter with dual 10 A relays (tariff and maxigraph), 1-minute resolution, and 72-hour lithium backup.
View detailsM96 SMART Single Phase Watt-Hour Meter (4-tariff, GSM-ready)
Single-phase smart electronic billing meter with four-tariff register, eight memory profiles, fifteen day / fifteen week / fifteen season tariff calendars, optical IEC 62053-21 port, and optional integrated GSM modem.
View detailsT96 STC6NKP Multifunctional Three Phase Watt-Hour Meter (4-tariff, GSM-ready)
Three-phase multifunctional four-tariff electronic billing meter (model STC6NKP) with eight memory profiles, fifteen day / week / season tariff calendars, optical IEC 62056-21 port, and optional integrated GSM modem. Direct-connect and CT-connected variants.
View detailsFour Phase Watt-Hour Meter (engineering inquiry)
Four-phase metering as an engineering build on our electronic meter platform. Specification defined per customer network; contact engineering.
View detailsTemperature Control
Programmable ambient and probe-fed temperature regulators with RTC scheduling, multi-tariff boiler thermostats, and IEC 62056 / OBIS temperature data loggers.
Energetika-VDS TLU 1.0 Temperature Logging Unit
IEC 62056 Mode C temperature data logger with OBIS coding, 9356-record memory, programmable 1-60 min interval, 2-year battery-backed RTC, and PC support software.
View detailsEnergetika-VDS DT Programmable Ambient Temperature Regulator
Programmable ambient-temperature regulator with ten memory registers plus weekend register, RTC scheduling, ±1 s/day accuracy, and 2-year lithium backup. 10 A or 20 A relay variants.
View detailsEnergetika-VDS ST Programmable Temperature Regulator with External Probe
Programmable external-probe temperature regulator, -40 to +125 °C range, ten memory registers plus weekend register, RTC scheduling, and 2-year lithium backup. 10 A or 20 A relay variants.
View details
K043 Multi-Tariff Boiler Thermostat
Programmable boiler thermostat with tariff-aware switching, ten memory registers plus weekend register, water-temperature range +10 to +80 °C, single or dual heater relays.
View detailsLED Lighting
Industrial high-bay LED fixtures and select OEM lighting we manufacture under our own line, with universal AC input and UL1310 Class 2 driver platforms.
RGB Architectural Lighting
Differentiated IP68 submersible RGB spotlights and the bundled C-300 lamp-control system for pools, fountains, and architectural feature lighting.
Street Lighting Control
Cellular-managed street lighting nodes and head-end software (legacy GSM platform documented under Engineering capabilities).