Research

Connected Electronics Manufacturing Trends

CRA timeline, Matter adoption, eSIM growth, and what they mean for production.

2026-04-20

More Info
Research

Why Automated PCB Assembly Is in Demand

Skills shortage, EU reshoring, and connected-product growth are driving demand for automated PCBA in Europe.

2026-04-12

More Info
Research

Box-Build Assembly for Connected Devices

Antenna placement, gasketing, post-test labeling, and the box-build choices that decide field reliability.

2026-04-02

More Info
Research

Secure Provisioning for IoT Device Manufacturing

X.509, secure elements, AWS DPS, Azure DPS, and the production-side workflow that makes them work.

2026-03-26

More Info
Research

Why Firmware Flashing Belongs in Production

Field-flashing has hidden costs that production-side flashing eliminates.

2026-03-18

More Info
Research

Traceability in Connected Electronics Production

GS1 DataMatrix, per-board logging schema, and what audit-ready traceability looks like.

2026-03-04

More Info
Research

European Electronics Manufacturing Opportunities

EU Chips Act, IPCEI, Horizon Europe, and the practical openings for connected-product manufacturing.

2026-02-28

More Info
Research

Why Functional Testing Matters in PCBA

AOI catches placement defects (we run AOI in-house on every board). FCT catches behavior and is sourced through partner test houses when the test plan requires it. Field-failure cost favors both.

2026-02-10

More Info
Research

Second-Source Manufacturing and Supply-Chain Resilience

Post-2020 supply shocks have made dual-source the default for serious connected-product programs.

2026-01-22

More Info

Have a manufacturing question?

Engineering will reply with practical answers, not marketing copy.