- Board size
- 330 to 343 mm by 304 to 813 mm
- Throughput
- up to 4800 cph (typical 2500 to 3600)
- Component range
- 0201 to 35 mm bodies, BGA, 15 mil pitch QFP
- Feeders
- 96 single positions (144 with bank), 8 to 68 mm tape, tray, tube, loose
- Nozzles
- 4 standard
- Accuracy
- +/- 0.025 mm
- Max component height
- 16 mm
Capability
Pick-and-Place Assembly
Pick-and-place is the routing stage of the in-house SMT PCB production line. Each component pulled from a feeder, vision-aligned, and placed on the board at the right rotation and position. The LS60 handles small chips, BGAs, and tall components on the same panel.
Equipment on the line
Our SMT line runs the full product lifecycle on the same equipment: NPI, pilot, and recurring production. Single-shift placement capacity is approximately 4.8 million components per year (roughly 80 000 simple boards, 40 000 mid-complexity boards, or 12 000 meter-class boards per year), and scales linearly to a three-shift ceiling near 14.4 million placements per year. We are a high-mix manufacturer: we keep changeover discipline tight, so a 500-unit batch and a 50 000-unit annual programme run on the same line.
Process detail
- STAGE INPUT
-
Feeder load
Tape, tray, tube, and loose components loaded into 96 single positions (144 with bank).
-
Program load
CPL file loaded, fiducial alignment confirmed.
-
Placement
Vision-assisted placement at +/- 0.025 mm accuracy across the panel.
-
Verification
On-head vision plus downstream AOI confirm placement.
- STAGE OUTPUT
Files we accept
- CPL or pick-and-place file (csv, txt)
- BOM with manufacturer part numbers
- Assembly drawing for orientation reference
Tolerances and specs
- Placement accuracy
- +/- 0.025 mm
- Component range
- 0201 to 35 mm bodies, BGA, 15 mil QFP
- Feeders
- 96 single positions, 144 with bank
- Tape range
- 8 to 68 mm
- Max component height
- 16 mm
- Nozzles
- 4 standard
Throughput
up to 4800 cph theoretical, typical 2500 to 3600 cph
Frequently asked questions
Which design files do you accept?
Gerber RS-274X, ODB++, and IPC-2581 for PCB data. BOM in xlsx or csv with manufacturer part numbers. CPL or pick-and-place file in csv or txt. Step files for enclosures. Firmware binaries as hex, bin, or signed image bundles.
What is your minimum order quantity?
No fixed minimum. We run NPI pilots from a single unit through recurring production into the tens of thousands per year. Single-shift line capacity is approximately 4.8 million component placements per year; programmes above that level we plan jointly across multiple shifts during DFM and BOM review.
Discuss this capability
Share your BOM, gerbers, and CPL. Engineering reviews fit, throughput, and DFM, and replies within one business day.