Industry
Industrial Sensors
Industrial sensors live in harsh environments. They have to survive vibration, temperature swings, dust, and water, and they have to report accurate measurements over years. Production needs to deliver consistency unit to unit.
Buyer pains we hear most
- Cal data drift between units causes integration headaches downstream
- IP-rated sealing fails inconsistently if assembly torque is not controlled
- Replacement boards must match field-installed unit performance
- EMC compliance for industrial environments is non-trivial
Typical product traits
- Mixed-signal: analog front end with digital interface
- Sealed enclosure with cable gland or M12 connector
- Per-unit factory calibration written to NVS or EEPROM
- Long product life cycle with replacement-board obligation
Regulatory environment
Industrial EMC
IEC 61326-1
IP rating test
IEC 60529
RoHS
Directive 2011/65/EU
Test plan considerations
- Per-unit sensor calibration with traceable reference
- Vibration and shock sample test for batch acceptance
- IP integrity verification on assembled samples
- Long-term burn-in for thermal and electrical stability
Frequently asked questions
Do we need a written test plan?
Yes when functional test is in scope. A production test plan defines pass and fail criteria, FCT vectors, calibration steps, and serialization rules. We help draft one if your team has not written one yet, based on your firmware behavior and target field performance. The test plan is handed to the partner test house we coordinate with for FCT.
What does box-build assembly include?
PCBA integration, cable harnessing, mechanical fixturing, gasketing for IP rating, antenna placement, label application post test, and packaging to your spec. We confirm scope on each project so handoff between PCBA and final box is clean.
Do you support RoHS and REACH compliance?
Yes. We work with RoHS-compliant component selection and SAC305 lead-free solder by default. REACH substance documentation comes from supplier declarations forwarded with each batch.
Quote industrial sensors
Send your product files and a short description. We respond within one business day.