Energetika-VDS
We assemble your circuit boards to spec. Send the design files, we handle the rest.
PCB Assembly,
SMT Assembly,
Embedded Software,
Component Sourcing
In-house SMT line, AOI on every board, firmware loaded on the line.
Portfolio
Products we have built on our line
A rotating sample of devices we build in-house at Energetika-VDS: billing meters, instruments, controllers, industrial lighting. Each card is a real shipping product, not a stock photo.
-
T96 C1NKP Three Phase Electronic Watt-Hour Meter
-
T96M-C6NKP Three Phase Electronic Meter with DLC Modem
-
M96 C6NKP Single Phase Electronic Watt-Hour Meter
-
T96SD4N Prepaid Three Phase Two Tariff Meter
-
Analyzer K-10 Three Phase Field Power Analyzer
-
Energetika-VDS TLU 1.0 Temperature Logging Unit
-
K-96 Digital Real Time Counter
-
Energetika-VDS DT Programmable Ambient Temperature Regulator
-
Energetika-VDS ST Programmable Temperature Regulator with External Probe
-
K043 Multi-Tariff Boiler Thermostat
-
RGB-30P Submersible RGB LED Spotlight (IP68)
-
Industrial High-Bay Light IN-100
-
M96 SMART Single Phase Watt-Hour Meter (4-tariff, GSM-ready)
-
T96 STC6NKP Multifunctional Three Phase Watt-Hour Meter (4-tariff, GSM-ready)
-
Four Phase Watt-Hour Meter (engineering inquiry)
-
GSM SMS Controller (3-relay remote control)
How we build
The Novastar SMT line that ships these products
Bare board in, finished PCBA out. The same three machines run every job, every day.
Gold Print
DDM Novastar SPR-45
Solder paste stencil printer
- Max board width310 mm
- Stencil frameup to 23 by 23 inch
- Print area16 by 18 inch
Gold Place
DDM Novastar LS60
Pick-and-place machine
- Board size330 to 343 mm by 304 to 813 mm
- Throughputup to 4800 cph (typical 2500 to 3600)
- Component range0201 to 35 mm bodies, BGA, 15 mil pitch QFP
Gold Flow
DDM Novastar GF-120HT
Reflow soldering oven
- Conveyor width305 mm
- Heated tunnel1042 mm
- Heating zones3 top + 3 bottom (horizontal convection)
Core services
Four services, one production line
PCB assembly, SMT, embedded software, and component sourcing on an in-house line. Pick the scope that fits your product.
PCB Assembly
Surface-mount and through-hole PCB assembly on an in-house SMT PCB production line, with AOI in-house and firmware loading or sourced functional test on request.
SMT Assembly
Surface-mount technology assembly on the in-house SMT PCB production line: paste printing, pick-and-place, and reflow.
Embedded Software
Firmware loaded on the production line, board bring-up, signed boot, per-unit version logging tied to the board serial.
Component Sourcing
We source against your AVL when your team would rather not chase distributors. Alternates flagged, dual-source identified, lead-time risk surfaced before dates lock.
Through-Hole Assembly
Selective through-hole assembly when SMT is not the right fit for connectors, large components, or high-current pins.
Firmware Loading
In-line and offline firmware loading with multi-image support, signed bootloader chains, and per-unit log.
Why integrated production
One contract from BOM to inspected board
A real production line, not a benchtop. Solder paste, pick-and-place, lead-free reflow, AOI in-house on every board, and through-hole on the same job when the design calls for it. Firmware loading attaches to the same workflow.
Component sourcing runs in parallel against your AVL. Bring your own parts, or we source them. Either way the BOM locks before paste hits the stencil.
Manufacturing workflow
From quote to shipment
Every unit moves through defined production, firmware, test, and quality gates.
- RFQ INPUT
-
File review
BOM, gerbers, CPL reviewed against the in-house line.
-
BOM review and sourcing
AVL alignment, alternates flagged, optional sourcing arranged.
-
Assembly setup
Stencil, feeders, reflow profile prepared.
-
Solder paste printing
Stencil-based deposit on the SPR-45.
-
Pick-and-place assembly
Vision-assisted placement on the LS60.
-
Soldering and reflow
Six-zone horizontal convection reflow on the GF-120HT.
-
AOI (in-house)
AOI runs in-house on every assembled board.
-
Optional firmware loading
In-line or offline programming when required.
-
Sourced functional test
Coordinated through partner test houses against your test plan when required. Not done in-house.
-
Box-build and packaging
Sub-assembly, label after test, packed unit.
- SHIPMENT OUTPUT
Industries
Built for connected industrial, building, energy, and IoT products
IoT Device Manufacturing
Connected products with cloud provisioning, OTA firmware, and per-device identity from production.
More InfoIndustrial Sensors
Sealed sensor modules with vibration tolerance, calibration data per unit, and IP-rated enclosures.
More InfoAccess Control Hardware
NFC and RFID readers, secure-element credential handling, vandal-resistant enclosures.
More InfoHVAC Controllers
Thermostat and zone controller PCBA with relay durability, long product life, and field-firmware-update strategy.
More InfoEnergy Devices
Energy meters and monitors with high-current sensing, isolation barriers, and MID-aware design.
More InfoBuilding Automation
Lighting controllers, sensor nodes, and gateway devices with multi-protocol bus support.
More InfoSecond-source manufacturing
Need a parallel European production line?
Reduce single-supplier risk with a second-source line that mirrors your existing production. We accept your BOM, AVL, gerbers, test plan, and signing keys, and start with a pilot batch.
Quality and traceability
Every unit signed off, logged, and traceable
- IPC-A-610 acceptance criteria
Class 2 or Class 3 inspection profile applied per project.
- AOI on every board (in-house)
Automated optical inspection of placement and joints, on our own line.
- Per-unit traceability database
Serial, firmware hash, batch, operator, and machine program logged.
- Lead-free SAC305 reflow
RoHS-compliant solder profile across the line.
RFQ requirements
What to send when you request a quote
Minimum
- BOM with manufacturer part numbers
- Gerber RS-274X, ODB++, or IPC-2581
- CPL or pick-and-place file
Helpful additions
- Assembly drawing
- Schematic for sourcing alternates
- Firmware binary and signing key references
- Test procedure or production test plan
- Enclosure files for box-build
- Packaging spec
Portfolio + Engineering
What we have built on our own line
A dozen products we manufacture on our own SMT line: billing meters, instruments, controllers, and lighting. Each is paired with the firmware and PC software we wrote to ship it, and is a real case study of capability you can hire.
Product portfolio
The 12 products we currently build. Electronic meters, temperature controllers, industrial LED, RGB submersible spotlight.
View portfolioEngineering capabilities
Firmware, PC software, communications hardware, and full systems we designed and built alongside the SMT line.
View case studiesResources and references
Explore deeper into how we build
- BlogPractical notes on BOM, CPL, PCBA cost, and EU vs Asian sourcing.
- PCBWay alternative in EuropeWhen to stay on PCBWay and when an EU-shore EMS wins on landed cost and lead time.
- PCB assembly in the BalkansAn honest map of where EU buyers route mid-volume PCB assembly in 2026.
- ResearchLonger technical write-ups on assembly, metering, and embedded work.
- CompareEMS, prototype shop, and turnkey vs consigned sourcing comparisons.
- Quality and traceabilityPer-unit serial, batch, operator, machine program, firmware hash.
- Production transferTransferring an existing design into our line with no spec drift.
- All capabilitiesSolder paste, pick-and-place, reflow, AOI, sourced functional test.
- All industriesIndustrial control, energy metering, building automation, IoT.
- Quote estimatorIndicative PCBA cost in two minutes — placements, complexity, run size.
- About Energetika-VDSFounded 1992 in Strumica. Own-development meter heritage, contract EMS today.
Ready to send files?
Energetika-VDS engineering replies within one business day. NDA available before file exchange.