What this service includes

  • Batch planning and capacity scheduling
  • Production traveler discipline per batch
  • Change-order intake and impact analysis
  • Per-unit traceability database access
  • Defect tracking and root cause feedback
  • NPI gate review when transitioning from pilot to repeat

Production workflow for this service

  1. INPUT FILES
  2. Schedule

    Forecast received, capacity reserved, batch dates confirmed.

  3. Traveler

    Production traveler instantiated for the batch with current revision references.

  4. Run

    Batch produced through the in-house line.

  5. Sign-off

    Yield, defect data, and per-unit logs reviewed before release.

  6. Feedback

    Root-cause findings fed back into DFM and BOM for the next batch.

  7. OUTPUT

Right fit when

  • You have moved from pilot to repeat PCB assembly and need ongoing production discipline.
  • You need change-order handling without restarting the engagement.
  • You need traceability data that is queryable years later.

Frequently asked questions

What lead times can we expect?

New product introduction takes about 4 to 8 weeks depending on component availability and test fixture readiness. Repeat batches typically run on a 3 to 5 week cadence once tooling and test plan are in place.

Do you manage component sourcing?

Yes. We work from your approved vendor list (AVL) or build one with you, including dual-source identification for lead-time risk. We flag obsolete or long-lead parts during DFM review and propose alternates when needed.

How do you handle defects and rework?

Defects flagged during in-house AOI or returned from partner functional test are root-caused and either reworked under IPC-7711/7721 procedures or scrapped depending on root cause. Failure data feeds back into DFM review for the next batch.