Industries
Built for connected industrial, building, energy, and IoT products
Each vertical has its own buyer pains, regulatory environment, and test plan. We build with those in mind.
These are application areas, not a fixed menu. The real limit is what our SMT line can place and solder — 0201 to 35 mm parts, fine-pitch QFP, BGA, lead-free reflow. If your board fits that envelope, we assemble it, whatever it ends up inside. See the line specs.
IoT Device Manufacturing
Connected products with cloud provisioning, OTA firmware, and per-device identity from production.
More InfoIndustrial Sensors
Sealed sensor modules with vibration tolerance, calibration data per unit, and IP-rated enclosures.
More InfoAccess Control Hardware
NFC and RFID readers, secure-element credential handling, vandal-resistant enclosures.
More InfoHVAC Controllers
Thermostat and zone controller PCBA with relay durability, long product life, and field-firmware-update strategy.
More InfoEnergy Devices
Energy meters and monitors with high-current sensing, isolation barriers, and MID-aware design.
More InfoBuilding Automation
Lighting controllers, sensor nodes, and gateway devices with multi-protocol bus support.
More InfoEV Charging Accessories
Mode 2 cables, RCD modules, load-management controllers, and OCPP communication boards adjacent to the charger core.
More InfoLoRaWAN and LPWAN Gateways
Multi-channel concentrator gateways with GPS time sync, cellular backhaul, and outdoor-rated enclosures.
More InfoSmart Water and Utility Metering Electronics
Battery-powered metering boards for water, gas, and heat with 10-year battery life targets and wM-Bus or NB-IoT backhaul.
More InfoAir, Noise, and Water Quality Monitors
Outdoor sensor stations for PM2.5, NOx, CO2, noise, and water quality with solar-buffered power and cellular telemetry.
More InfoFleet and Asset Tracking Devices
GNSS and cellular trackers for trailers, containers, and machinery with multi-year battery and accelerometer wakeup.
More InfoBattery Management System (BMS) Boards
Cell monitoring, balancing, and pack controller boards for stationary storage, e-bikes, AGVs, and light electric vehicles. Not automotive ASIL-D traction packs.
More InfoSolar and PV Monitoring Electronics
String monitors, optimizer communication boards, and gateway devices for residential and commercial PV plants. Not inverter power stages.
More InfoPro Audio and Stage Electronics
DSP processor boards, networked audio endpoints (Dante, AES67), wireless receivers, and mixer surface controllers for fixed install and touring.
More InfoE-Bike and LEV Display and Controller Accessories
Handlebar displays, light controllers, anti-theft GPS modules, and CAN/UART bridge boards for e-bikes, e-scooters, and cargo trikes.
More InfoRetail and Hospitality Peripheral Electronics
Cash drawer drivers, customer-facing displays, kitchen display systems, ticket printer controllers, and table-pager bases. Not PCI PTS payment terminals.
More InfoQuote your product
Tell us the industry, the product class, and what you ship. We respond within one business day.