- Max board width
- 310 mm
- Stencil frame
- up to 23 by 23 inch
- Print area
- 16 by 18 inch
- Drive
- Semi-automatic, dual squeegee
- Power
- 110 V AC, 2 A
Capability
Our in-house SMT PCB production line runs as one continuous process, from solder paste deposit through component placement to soldering and reflow. Each step feeds the next, with vision verification at placement and AOI after reflow.
Our SMT line runs the full product lifecycle on the same equipment: NPI, pilot, and recurring production. Single-shift placement capacity is approximately 4.8 million components per year (roughly 80 000 simple boards, 40 000 mid-complexity boards, or 12 000 meter-class boards per year), and scales linearly to a three-shift ceiling near 14.4 million placements per year. We are a high-mix manufacturer: we keep changeover discipline tight, so a 500-unit batch and a 50 000-unit annual programme run on the same line.
Stencil mounted, paste loaded, dual-squeegee deposit across the panel.
Vision-assisted placement from up to 144 feeders.
Six-zone horizontal convection reflow, profile selected from 100 stored options.
Automated optical inspection of placement and joints against IPC-A-610 acceptance criteria.
In-line firmware loading when included in the scope. Functional test is sourced through partners when the test plan requires it.
Up to 4800 cph theoretical, typical mixed-board 2500 to 3600 cph
Gerber RS-274X, ODB++, and IPC-2581 for PCB data. BOM in xlsx or csv with manufacturer part numbers. CPL or pick-and-place file in csv or txt. Step files for enclosures. Firmware binaries as hex, bin, or signed image bundles.
Automated optical inspection runs on every assembled board against IPC-A-610 acceptance criteria. We support Class 2 and Class 3 inspection profiles. X-ray inspection is available through partner labs for BGA and high-density boards when required.
No fixed minimum. We run NPI pilots from a single unit through recurring production into the tens of thousands per year. Single-shift line capacity is approximately 4.8 million component placements per year; programmes above that level we plan jointly across multiple shifts during DFM and BOM review.
Share your BOM, gerbers, and CPL. Engineering reviews fit, throughput, and DFM, and replies within one business day.