Request a Quote

Use the quote form to send your BOM, gerbers, CPL, and other production files. Engineering reviews and replies within one business day.

Request a Quote

Engineering email

For technical questions, capability discussions, or DFM reviews:

[email protected]

NDA available on request before file exchange.

Address

Janko Cvetinov 13

Strumica, North Macedonia

What to expect

  • Acknowledgement within one business day.
  • Quote response or DFM questions within 3 to 5 business days for typical projects.
  • NDA exchanged before sensitive files.
  • Files reviewed by engineering, not auto-quoted by a script.

Frequently asked questions

Which design files do you accept?

Gerber RS-274X, ODB++, and IPC-2581 for PCB data. BOM in xlsx or csv with manufacturer part numbers. CPL or pick-and-place file in csv or txt. Step files for enclosures. Firmware binaries as hex, bin, or signed image bundles.

What is your minimum order quantity?

No fixed minimum. We run NPI pilots from a single unit through recurring production into the tens of thousands per year. Single-shift line capacity is approximately 4.8 million component placements per year; programmes above that level we plan jointly across multiple shifts during DFM and BOM review.

What lead times can we expect?

New product introduction takes about 4 to 8 weeks depending on component availability and test fixture readiness. Repeat batches typically run on a 3 to 5 week cadence once tooling and test plan are in place.

Do you manage component sourcing?

Yes. We work from your approved vendor list (AVL) or build one with you, including dual-source identification for lead-time risk. We flag obsolete or long-lead parts during DFM review and propose alternates when needed.

Why manufacture in Europe?

Shorter lead times to EU customers, faster engineering communication during a product change, EU regulatory alignment (CE, RED, CRA, GDPR posture), and reduced supply-chain distance for spare component runs.

Ready to send files?

The quote form is structured to capture what we need to scope production correctly the first time.