PCB Assembly

Surface-mount and through-hole PCB assembly on an in-house SMT PCB production line, with AOI in-house and firmware loading or sourced functional test on request.

SMT Assembly

Surface-mount technology assembly on the in-house SMT PCB production line: paste printing, pick-and-place, and reflow.

Through-Hole Assembly

Selective through-hole assembly when SMT is not the right fit for connectors, large components, or high-current pins.

Embedded Software

Firmware loaded on the production line, board bring-up, signed boot, per-unit version logging tied to the board serial.

Firmware Loading

In-line and offline firmware loading with multi-image support, signed bootloader chains, and per-unit log.

Sourced Functional Testing Coordination

AOI runs in-house on every board. Functional test (FCT) is sourced through partner test houses when your test plan requires it. We coordinate the handoff, fixtures, and results.

Box-Build Support

Sub-assembly through full system integration: cabling, mechanical, gasketing, antenna placement, labeling, packaging.

Production Support

Production-side support around the assembly line: scheduling, batch planning, traveler discipline, change-order handling.

Component Sourcing

We source against your AVL when your team would rather not chase distributors. Alternates flagged, dual-source identified, lead-time risk surfaced before dates lock.

Second-Source Assembly

Parallel European PCB assembly capacity for products you already build elsewhere. Supply-chain resilience without IP risk.

Frequently asked questions

What is your minimum order quantity?

No fixed minimum. We run NPI pilots from a single unit through recurring production into the tens of thousands per year. Single-shift line capacity is approximately 4.8 million component placements per year; programmes above that level we plan jointly across multiple shifts during DFM and BOM review.

What lead times can we expect?

New product introduction takes about 4 to 8 weeks depending on component availability and test fixture readiness. Repeat batches typically run on a 3 to 5 week cadence once tooling and test plan are in place.

Do you manage component sourcing?

Yes. We work from your approved vendor list (AVL) or build one with you, including dual-source identification for lead-time risk. We flag obsolete or long-lead parts during DFM review and propose alternates when needed.

Which design files do you accept?

Gerber RS-274X, ODB++, and IPC-2581 for PCB data. BOM in xlsx or csv with manufacturer part numbers. CPL or pick-and-place file in csv or txt. Step files for enclosures. Firmware binaries as hex, bin, or signed image bundles.

How is solder joint quality verified?

Automated optical inspection runs on every assembled board against IPC-A-610 acceptance criteria. We support Class 2 and Class 3 inspection profiles. X-ray inspection is available through partner labs for BGA and high-density boards when required.

Why manufacture in Europe?

Shorter lead times to EU customers, faster engineering communication during a product change, EU regulatory alignment (CE, RED, CRA, GDPR posture), and reduced supply-chain distance for spare component runs.

Send files for a quote

Energetika-VDS engineering replies within one business day. NDA on request before file exchange.