Typical BOM characteristics

  • Application processor with embedded flash and RAM
  • Multi-radio: BLE, Wi-Fi, optional LoRa, optional cellular modem
  • Power management with battery backup option
  • External or PCB antennas with tuning constraints

Test plan example

  • Boot to bootloader, verify signed image enforcement
  • Application boot to known service state
  • Per-radio TX power and RX sensitivity check against golden unit
  • Cellular modem registration to test network if applicable
  • Cloud enrollment confirmation in DPS or IoT Core

Box-build scope

  • PCBA into ABS or aluminum housing
  • Antenna placement and orientation per RF design
  • Cable harness for power and external antennas
  • Gasketing for indoor or sheltered outdoor IP rating
  • Label with serial, MAC, IMEI (if cellular), and certifications

Lead-time pattern

8 to 10 weeks NPI, 5 to 6 weeks repeat batch

Scope split

What we own

  • SMT and through-hole assembly
  • AOI on every board
  • Firmware flashing and provisioning
  • Sourced FCT coordination through partner test house
  • Box-build
  • Per-unit traceability log

What you provide

  • Firmware repo and signing keys
  • Test plan and golden unit
  • Cloud platform credentials for enrollment

Start your iot gateway RFQ

Send a short description and your files. We respond within one business day.