Buyer pains we hear most

  • 1500 V DC isolation creepage distances on PCB are easily compromised by conformal coat bridging or contamination in assembly
  • Lightning and switching surge events on communication ports cause field returns that are preventable with correct TVS placement and assembly
  • SunSpec and Modbus register map compliance must be verified against multiple inverter brands before shipment
  • UV-stable enclosure materials are frequently omitted from the initial BOM and only discovered during field inspection

Typical product traits

  • DC string voltage and current sensing with reinforced isolation rated to 1500 V PV potential
  • PLC, RS-485, or wireless mesh communication to gateway
  • Modbus TCP and SunSpec-compliant gateway output
  • Surge protection on all PV-side communication ports

Regulatory environment

PV system performance monitoring

IEC 61724-1

PV array safety

IEC 62548

Low Voltage Directive

2014/35/EU

EMC residential and light industrial

EN 61000-6-3

Test plan considerations

  • Per-unit hipot test across reinforced isolation barrier at 1500 V DC string potential
  • Surge protection component verification per unit on communication ports
  • Modbus and SunSpec register map functional test against reference inverter simulator
  • Enclosure UV resistance material review at BOM stage before first production build

Frequently asked questions

Do we need a written test plan?

Yes when functional test is in scope. A production test plan defines pass and fail criteria, FCT vectors, calibration steps, and serialization rules. We help draft one if your team has not written one yet, based on your firmware behavior and target field performance. The test plan is handed to the partner test house we coordinate with for FCT.

Do you support RoHS and REACH compliance?

Yes. We work with RoHS-compliant component selection and SAC305 lead-free solder by default. REACH substance documentation comes from supplier declarations forwarded with each batch.

Do you manage component sourcing?

Yes. We work from your approved vendor list (AVL) or build one with you, including dual-source identification for lead-time risk. We flag obsolete or long-lead parts during DFM review and propose alternates when needed.

Quote solar and pv monitoring electronics

Send your product files and a short description. We respond within one business day.