Overview
IN-100 is the high-output variant of our industrial high-bay platform. Hook-mounted aluminium reflector for ceilings 7-12 m, narrow ±25° beam with secondary bands at ±7°/±9°/±15.5°. Universal 90-264 VAC input with built-in active PFC drives a UL1310 Class 2 supply. Full electrical and thermal protection set: short circuit, overload, overvoltage, overtemperature, with re-power on to recover. Built on our line; driver and LED array tested as a complete assembly before shipping.
Key features
- Universal AC input with active PFC
- UL1310 Class 2 driver
- Narrow ±25° beam for ceiling heights 7-12 m
- Full electrical and thermal protection with auto re-power recovery
Standards
- UL1310 Class 2