Buyer pains we hear most

  • Pilot signal tolerance drift between units causes charge-session failures in the field
  • Per-unit RCD verification adds test time that must be planned into production throughput
  • OCPP chargepoint operator certification imposes firmware version traceability requirements
  • Cable strain relief field failures trace back to inconsistent assembly torque and crimp force

Typical product traits

  • PWM control pilot with tight tolerance analog front end
  • RCD type B front end for AC and DC fault detection
  • OCPP 1.6 or 2.0.1 modem for cloud communication and load management
  • Industrial connector termination with defined crimp and torque specification

Regulatory environment

EV conductive charging system

EN IEC 61851-1

In-cable control and protection device (IC-CPD)

IEC 62752

EMC for EV charging equipment

EN IEC 61851-21-2

Low Voltage Directive

2014/35/EU

Test plan considerations

  • Per-unit pilot signal amplitude and duty cycle verification against EN IEC 61851-1 tolerance
  • Per-unit RCD trip test covering AC and DC fault conditions
  • OCPP message exchange functional test against reference backend
  • Connector pull-out and strain relief mechanical sample test per batch

Frequently asked questions

Do we need a written test plan?

Yes when functional test is in scope. A production test plan defines pass and fail criteria, FCT vectors, calibration steps, and serialization rules. We help draft one if your team has not written one yet, based on your firmware behavior and target field performance. The test plan is handed to the partner test house we coordinate with for FCT.

Can you load and provision firmware in production?

Yes. Firmware loading runs on the line through dedicated programming fixtures. We support SWD, JTAG, UART, and USB-DFU interfaces, multi-image programming (bootloader, application, file system), and signed bootloader chains. When the customer test plan calls for functional test alongside flashing, the unit moves on to a partner test house with the firmware already loaded.

Do you support RoHS and REACH compliance?

Yes. We work with RoHS-compliant component selection and SAC305 lead-free solder by default. REACH substance documentation comes from supplier declarations forwarded with each batch.