Buyer pains we hear most

  • Per-unit hipot on the isolation barrier requires a defined test fixture and pass criteria aligned to the safety case
  • Cell voltage measurement calibration drift between ICs causes balancing errors over battery lifetime
  • Firmware is part of the functional safety case and version traceability must follow the board into the field
  • Connector and busbar torque field failures trace to uncontrolled assembly processes

Typical product traits

  • Cell monitoring IC (LTC68xx, BQ769xx, or ISL94xxx series) with isolated daisy-chain communication
  • Active or passive cell balancing with per-cell monitoring
  • High-current shunt or Hall-effect sensor for pack current measurement
  • CAN or RS-485 communication with galvanic isolation

Regulatory environment

Stationary lithium battery safety

IEC 62619

Portable lithium secondary cells

IEC 62133-2

Functional safety (general)

IEC 61508 (SIL)

Industrial EMC

IEC 61326-1

Test plan considerations

  • Per-unit hipot test across the isolation barrier to the voltage specified in the safety case
  • Per-unit cell voltage measurement calibration check and deviation record
  • Firmware version verification and traceability record per board serial number
  • Connector and busbar mechanical torque and pull-force sample test per batch

Frequently asked questions

Do we need a written test plan?

Yes when functional test is in scope. A production test plan defines pass and fail criteria, FCT vectors, calibration steps, and serialization rules. We help draft one if your team has not written one yet, based on your firmware behavior and target field performance. The test plan is handed to the partner test house we coordinate with for FCT.

Can you load and provision firmware in production?

Yes. Firmware loading runs on the line through dedicated programming fixtures. We support SWD, JTAG, UART, and USB-DFU interfaces, multi-image programming (bootloader, application, file system), and signed bootloader chains. When the customer test plan calls for functional test alongside flashing, the unit moves on to a partner test house with the firmware already loaded.

Do you support RoHS and REACH compliance?

Yes. We work with RoHS-compliant component selection and SAC305 lead-free solder by default. REACH substance documentation comes from supplier declarations forwarded with each batch.

Quote battery management system (bms) boards

Send your product files and a short description. We respond within one business day.