Overview
ST is the external-probe sibling of the DT regulator. Same RTC and ten-register programmable schedule, with a wide -40 to +125 °C probe range for ovens, boilers, refrigeration coils, and process tanks. Two-line LCD shows probe temperature alongside the active set-point. 10 A or 20 A relay variants share one board.
Key features
- External probe -40 to +125 °C
- Ten programmable time / temperature set-points + weekend register
- Real-time clock with ±1 s/day accuracy
- 3.6 V lithium backup retains schedule for 2 years