GSM SMS Controller (3-relay remote control)

Street Lighting Control

GSM SMS Controller (3-relay remote control)

GSM/SMS-driven remote controller for three electrical devices. 900/1800 MHz dual-band GPRS Class B, external SIM, RTC backup, 2 kW per relay, -40 to +80 °C operating range.

Overview

GSM-SMS Controller is a remote-control unit for heating systems, gates, and other premises that must be commanded over the cellular network. Operator sends an SMS from any registered SIM; the controller parses the command text and switches one or all three of its 2 kW low-voltage relays. State is remembered across mains failure on a battery-backed RTC; backup power keeps the unit reachable during a mains outage so the operator still gets fault alerts. Operating range covers outdoor cabinets from -40 to +80 °C.

Key features

  • Send SMS to switch any of three relays or reboot a device
  • Command parser accepts custom text per relay
  • Mains-fail state remembered (relays return to last commanded state on power restore)
  • Backup power keeps the unit reachable during a grid outage
  • External SIM slot for operator-chosen carrier
  • Wide -40 to +80 °C range for outdoor enclosures

Part of our GSM remote-control & telemetry family

Cellular control and telemetry products that share the same GSM stack. One supplier, one migration path off 2G to LTE-M / NB-IoT when you need it.