T96 STC6NKP Multifunctional Three Phase Watt-Hour Meter (4-tariff, GSM-ready)

Energy & Metering

T96 STC6NKP Multifunctional Three Phase Watt-Hour Meter (4-tariff, GSM-ready)

Three-phase multifunctional four-tariff electronic billing meter (model STC6NKP) with eight memory profiles, fifteen day / week / season tariff calendars, optical IEC 62056-21 port, and optional integrated GSM modem. Direct-connect and CT-connected variants.

Overview

STC6NKP is our multifunctional three-phase electronic meter, available in direct-connect and CT-connected versions. Programmable four-tariff register, eight memory profiles, and a fifteen-deep calendar (15 day + 15 week + 15 season definitions). Optical IEC 62056-21 walk-by port, OBIS-coded LCD register, six-year quartz-RTC backup, and an optional integrated GSM modem for cellular read and tariff write from a head-end. Wall-mount enclosure (175 × 80 × 300 mm) built on our SMT line.

Key features

  • Direct-connect (10(60) A) or CT-connected (5(6) A) variants on the same firmware platform
  • Four-tariff register with full calendar engine (15 day + 15 week + 15 season definitions)
  • Eight memory profiles, switched on event or schedule
  • Optical IEC 62056-21 walk-by port
  • Optional integrated GSM modem
  • Six-year quartz-RTC backup

Standards

  • IEC 62053-21
  • IEC 62052-11
  • IEC 62056-21

Variants

STC6NKP direct (3-phase, 10(60) A)

Direct-connect three-phase, up to 60 A per phase. Residential and small commercial billing without CTs.

Nominal current In
10 A
Maximal current Imax
60 A direct
Order code suffix
-3P

STC6NKP transformer (3-phase, CT)

CT-connected three-phase. External 5(6) A CTs scale to any primary current. Industrial sub-metering, grid-tie billing.

Nominal current In
5 A (CT secondary)
Maximal current Imax
6 A (CT secondary)
Order code suffix
-CT

Part of our GSM remote-control & telemetry family

Cellular control and telemetry products that share the same GSM stack. One supplier, one migration path off 2G to LTE-M / NB-IoT when you need it.