Use case
Smart Lighting Controller Production
A wall-mount or in-luminaire lighting controller with mesh networking. Volume 2000 to 10000 units per batch. Each unit gets unique mesh credentials and Matter or Zigbee commissioning data.
Typical BOM characteristics
- Mains TRIAC or relay drive output
- Wireless SoC with Matter or Zigbee stack
- Power supply with isolation
- Compact form factor
Test plan example
- Mains isolation hipot test
- Wireless TX power and RX sensitivity
- Matter or Zigbee commissioning round-trip
- Output drive verification at multiple load steps
Box-build scope
- PCBA into wall-box or in-luminaire housing
- Terminal wiring for mains and load
- Label with serial and certifications
- Pack with commissioning instructions
Lead-time pattern
8 to 10 weeks NPI, 4 to 5 weeks repeat batch
Scope split
What we own
- SMT assembly
- AOI on every board
- Firmware flashing and per-unit credential injection
- Sourced FCT coordination through partner test house
- Box-build
What you provide
- Firmware and commissioning credentials
- Housing parts
- Customer cloud or hub for commissioning verification
Start your smart lighting controller RFQ
Send a short description and your files. We respond within one business day.