Engineering pc software
Smart-meter tariff-programming software
Windows desktop for programming the four-tariff calendar engine of the M96 / T96 SMART meter family: fifteen day definitions, fifteen week definitions, fifteen season definitions, eight memory profiles. Visual editor with weekday and season heat-map view.
What it is
For the M96 / T96 SMART meter family we built a dedicated tariff-programming desktop. The operator paints a four-tariff colour map across each day definition (24-hour timeline, T1-T4 colour bands), composes weeks from those day definitions, builds seasons from those weeks, and writes the resulting calendar plus eight memory profiles to the meter over the optical port. The result: a utility can change a whole national tariff scheme with a single project file pushed to every meter on the fleet, instead of touching each unit by hand.
What we built
- Day-definition editor (15 stored, four-tariff colour painter on 24 h × five-minute resolution)
- Week-profile editor (15 stored)
- Season-profile editor (15 stored, with start/end date + week profile reference)
- 12-month heat-map preview of the resulting tariff colours per calendar day
- Change-profile / Upload-profile commands over the optical port
- Project save/open, export to the meter, push to fleet
Technologies
- IEC 62056-21 Mode C optical link to the meter
- Visual tariff editor: 24-hour day timeline with four colour bands (T1-T4)
- Week composer (Mon-Sun, day-definition assignment per slot)
- Season composer (week profile + start/end date)
- 12-month season heat-map preview
- Eight on-meter memory profiles, switchable on schedule or event
Deliverables
- Windows installer (companion to the meter line)
- Sample tariff project files
- Operator manual
Honest note
Optical-link variant ships first; cellular / DLC push to fleet uses the same tariff project files via SuperNet head-end.