Overview
We can build a four-phase metering variant on the same electronic meter platform that runs our STC6NKP and M96 / T96 family. Because four-phase networks differ widely by site (derived-neutral split phase, three-phase plus a controlled fourth conductor, instrumented PE/N), there is no fixed datasheet for this configuration. Send your network topology, current rating, tariff scheme, and communication requirement, and engineering returns a specification and quote. This entry is a capability statement, not a stocked product.
Key features
- Built on our existing electronic meter firmware and SMT line
- Configuration agreed against your network topology before quote
- Inherits the optical port, tariff engine, and GSM option of the STC6NKP platform where applicable