Typical BOM characteristics

  • Mains-side power supply with isolation barrier
  • Relay outputs for actuators
  • Sensor inputs (temperature, humidity)
  • BACnet, Modbus, or KNX communication

Test plan example

  • Hipot isolation test on every unit
  • Relay continuity and switching test
  • Sensor input verification
  • Communication interop test against reference master
  • Firmware version verification matched to part number

Box-build scope

  • PCBA into DIN-rail or wall-mount housing
  • Terminal block wiring for inputs and outputs
  • Label with model, serial, certifications
  • Pack with installation guide

Lead-time pattern

10 weeks NPI, 4 to 5 weeks repeat batch

Scope split

What we own

  • SMT and through-hole assembly
  • AOI on every board
  • Sourced hipot and FCT coordination through partner test house
  • Box-build with terminal wiring

What you provide

  • Firmware versioning matched to product variant
  • Communication interop reference
  • Housing parts

Start your hvac controller RFQ

Send a short description and your files. We respond within one business day.